Been busy the last 2 days! Finally got these gauges finished up, I had them wired, but I still had to drill and tap the holes for the exhaust probe and the boost hose fitting. Im also finally getting to finishing my new box to house my new sub. I replaced my 2 10s with 1 shallow mount 12. I re drilled the rails on my back bench seat and slid it forward an inch and a half to fit the box behind the seat. You will barely be able to see the sub and box behind the middle arm rest. I coated the box in herculiner like i always do ha ha. Its drying right now, ill re wire it and put it in tomorrow. And here's a teaser. EBC slotted rotors and EBC "Green stuff" 7000 series pads. The rotors have a 100k miles guarantee against warping, and the pads are said to go 70k if not abused. Ive also got this little guy to go with my column shifter. I just have to mod the resisters for the wipers.